Where is the site?
Name the job and type the pincode. SiteQuant fills in the area and state.
Units
Price units for sand, steel, bricks and cement (brass, tonne, per 1,000…) are set in step 3, Rates.
Government rate documents
Choose a state, or type a pincode, to see its schedule of rates.
What are you building?
Add each part of the job and enter its sizes. Quantities work out as you type.
Concrete RCC and PCC
–––
0.00 m³Included items only. Formwork, labour, transport and water are not in material costs.
Brick walls
–––
0.00 m³Included walls only. Lintels, DPC, labour and scaffolding are not included.
Plaster
–––
0.00 m²Included surfaces only. Primer, mesh, scaffolding, curing and labour are not included.
Make items from a file
A measurement sheet in Excel, PDF or Word, or a photo of one. The assistant reads its rows and proposes the items; you check them and tap Apply.
Drawing
Each item is drawn to its own shape with the sizes you entered. Very thin parts are drawn thicker so you can see them. Tap a drawing to open its item.
Materials needed
Totals for all included items, with each item's allowance for wastage.
Your rates
Prices you pay for materials, in the units your suppliers use. Change any number, or tap Confirm when a starting rate is right.
Material rates
Checking values…
Mix factors and cement density
Used by every calculation. Change them only to match your specification.
M20 and M25 here are planning proportions by volume, not an approved mix design.
Labour rates optional
What you pay labour for each unit of work. Each item then shows its labour beside its materials, like a schedule-of-rates item. Leave at 0 to cover labour with the percentage below instead.
Set labour rates per item
Labour, margin and tax
Percentages added on top of the items. Leave at 0 if not part of this quote. If you set labour rates above, use the first one for site overhead only.
No rate list attached.
Government rates (DSR / SSR)
Choose the state on step 1 to see its schedule of rates.
Supplier rate list
Attach a supplier's price list or quotation: Excel, Word, PDF, CSV, text, or a photo. SiteQuant finds the rates, converts brass, tonne and per-1,000 prices, and shows each line before you apply it.
Rates found
0 foundTick the rates you trust. You can change a number before applying it.
No rate list attached.
Quote for your client
Estimate check
–Catches typing mistakes before you send the quote. Warnings do not stop you issuing it.
Bill of quantities
DraftShow the full BOQ
| Item | Description | Unit | Qty | Rate | Amount |
|---|
Your company details
Not setPrinted on every PDF and Excel. Saved once for all projects.
Your estimates
Your saved estimates appear here. Tap New estimate to start one.
Keep a copy off this phone
Checking storage…
No backup made yet.
The open estimate has unsaved changes. Save it to include them in a backup.
New backup files are encrypted with a separate passphrase that never leaves this device. Keep the passphrase safe: SiteQuant cannot recover it if you forget it. Older JSON backups remain restorable but are not encrypted.